Projects

IGAT V Gas Pipeline Project

Contract Start Date: 2003

Services Provided: Engineering and Procurement for South Pars Gas Field Development and Fifth Gas Transmission Line Pressure Boosting Stations

Client: National Iranian Gas Company (NIGC)

Number of Contracts: 22 Turbocompressors

Destination: South Pars Gas Field, Khormoj Gas Pressure Boosting Station, Ab Pakhsh Gas Pressure Boosting Station, Sardasht Gas Pressure Boosting Station

The IGAT V Gas Pipeline, also known as the Fifth Nationwide Gas Pipeline, is a natural gas pipeline in Iran that transports gas from the Assaluyeh Gas Condensate Complex in South Pars to the Aghajari, Gachsaran, Bibi Hakimeh, and Pazanan oil fields. The pipeline is approximately 508 kilometers long and is equipped with five pressure boosting stations to maintain the flow of gas. OTC was responsible for the design, procurement, construction, services, and commissioning of these five pressure boosting stations.

 

TC50 Gas Compressor Project

Contract Start Date: 2001

Services Provided: Domestic manufacturing of gas compressor equipment in Iran

Client: National Iranian Gas Company (NIGC)

Number of Contracts: 50 gas compressors

Destination: National gas transmission pipelines

The TC50 Gas Compressor Project involved the domestic manufacturing of 50 gas compressors for use in Iran’s national gas transmission pipelines. The project was completed in 2009 and all of the gas compressors are currently in operation at stations along the pipelines.

POGC40 Gas Compressor Project

Contract Start Date: 2007

Services Provided: Manufacturing of 35 gas compressors

Client: Pars Oil and Gas Company (POGC)

Number of Contracts: 35 gas compressors

Destination: South Pars Gas Field phases in Assaluyeh

The POGC40 Gas Compressor Project involved the manufacturing of 35 gas compressors for use in the South Pars Gas Field phases in Assaluyeh, Iran. The project was completed in 2014 and all of the gas compressors are currently in operation.

photo8145249839

TC100 Gas Compressor Project

Contract Start Date: 2007

Services Provided: Domestic manufacturing of 100 gas compressors for Iran’s main gas pipelines

Client: Iranian Gas Engineering and Development Company (IGEDC)

Number of Contracts: 100 gas compressors

Destination: 16 pressure boosting stations on Iran’s main gas pipelines

The TC100 Gas Compressor Project involved the domestic manufacturing of 100 gas compressors for use in 16 pressure boosting stations on Iran’s main gas pipelines. The project is still ongoing, with 51 gas compressors and 6 engine units delivered to date. Of the 51 gas compressors delivered, 49 have been installed and commissioned. It is expected that 8 more gas compressors will be shipped to the Bastak and Lamerd facilities by the end of 2025.

KPRC Gas Compressor Project

Contract Start Date: 2016

Services Provided: Design, engineering, manufacturing, and commissioning of gas compressors

Client: Kangan Petro-Refining Company (KPRC)

Number of Contracts: 6 x 25-megawatt gas compressors and 1 x turbine spare engine unit

Destination: Kangan Petro-Refining Company (KPRC)

The KPRC Gas Compressor Project involved the design, engineering, manufacturing, and commissioning of 6 x 25-megawatt gas compressors and 1 x turbine spare engine unit for use at the Kangan Petro-Refining Company (KPRC) in Iran. The project was completed in February 2021 and the gas compressors are currently in operation.

default

NGL3100 Power Plant Project

Contract Start Date: 2019

Services Provided: Supply of power plant equipment and substation for the NGL3100 complex

Client: Dehloran Power Plant Company

Number of Contracts: 6 x 25-megawatt turbogenerators

Destination: Dehloran Power Plant Company

The NGL3100 Power Plant Project involved the supply of complete equipment for a 150-megawatt power plant and its substation at the NGL3100 complex in Dehloran, Iran. The project is still ongoing, with 3 turbogenerators commissioned and connected to the national grid, providing a total of 65 megawatts of electricity. The remaining 3 units are expected to be added by the end of 2025, and the project will be completed and handed over to the client by the end of the year.

Sabadehloran 360 MW Power Plant Project

Contract Start Date: 2021

Services Provided: Construction of Sabadehloran Power Plant No. 2

Client: Dehloran Power Plant Company

BUPC Project

Contract Start Date: 2007

Services Provided: Domestic manufacturing of 100 gas compressors for Iran’s main gas pipelines

Client: Iranian Gas Engineering and Development Company (IGEDC)

Number of Contracts: 100 gas compressors

Destination: 16 pressure boosting stations on Iran’s main gas pipelines

The TC100 Gas Compressor Project involved the domestic manufacturing of 100 gas compressors for use in 16 pressure boosting stations on Iran’s main gas pipelines. The project is still ongoing, with 51 gas compressors and 6 engine units delivered to date. Of the 51 gas compressors delivered, 49 have been installed and commissioned. It is expected that 8 more gas compressors will be shipped to the Bastak and Lamerd facilities by the end of 2025.

Nar Project

Contract Start Date: 2022

Services Provided: EPCF revamping of the Nar Gas Field Pressure Boosting Station

Client: Central Iran Oil Fields Company (CIOC)

Number of Contracts: 4 x compressors

Destination: Nar Gas Field Pressure Boosting Station

The Nar Gas Field Pressure Boosting Station Revamping Project is an EPCF project that involves the revamping of the existing gas field pressure boosting station at the Nar Gas Field in Iran. The project will include the replacement of the existing compressors with new, more efficient compressors, as well as the upgrade of other equipment and systems. The project is expected to be completed in 2025.

آماده سازی واحد 3 جهت سنکرون

Olefins Project

Contract Start Date: 2022

Services Provided: Construction of an olefins unit at Dehloran Petrochemical Complex

Client: National Iranian Oil Engineering and Construction Company (NIOEC)

Number of Contracts: 3 x compressor packages

Destination: Dehloran Petrochemical Complex

The Olefins Project involves the construction of an olefins unit at the Dehloran Petrochemical Complex in Dehloran, Iran. The unit will produce 300,000 tons per year of high-density polyethylene (HDPE), 300,000 tons per year of linear low-density polyethylene (LLDPE)/swing high-density polyethylene (HDPE), and 160,000 tons per year of polypropylene (PP). The project is expected to be completed in 2026.